GNWT-INF - W2020L8-0002
Status:
Expired
Authorization:
Licence
Activity:
Miscellaneous
Start:
January 25, 2021
Expiry:
January 24, 2023
Staff:
Anneli Jokela
This Licence entitles the Licensee to construct an embankment, replace a culvert at location 62° 47’01.25” N and 115° 58’24.09” W, and placement of fill into ponded wet areas from km 240 to 243 of NWT Highway 3 to bring the road grade up to the design height.
This Licence is for surface repair works from Km 240 to 243 on Highway 3.
This Licence is for surface repair works from Km 240 to 243 on Highway 3.
Documents
Displaying 1 - 20 of 20
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - NWT Hwy 3 Repair Works - Type B Water Licence - Reasons for Decision - Jan 25_21.pdf (259.52 KB) | ||
GNWT-INF - NWT Hwy 3 Repair Works - Type B Water Licence - Issuance Letter and Licence - Jan 25_21.pdf (320.04 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - NWT Hwy 3 Repair Works - Water Licence Application - Additional Information - Sep 29_20.pdf (883.35 KB) | ||
GNWT-INF - NWT Hwy 3 Repair Works - Water Licence Application - Notice of Application - Oct 12_20.pdf (200.88 KB) | ||
GNWT-INF - NWT Hwy 3 Repair Works - Water Licence Application - Engagement Record - Sep 29_20.pdf (749.86 KB) | ||
GNWT-INF - NWT Hwy 3 Repair Works - Water Licence Application - Sep 29_20.pdf (2.4 MB) | ||
GNWT-INF - NWT Hwy 3 Repair Works - Water Licence Application - Figures and Maps - Sep 29_20.pdf (5.85 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - NWT Hwy 3 Repair Works - GNWT-INF Response to WLWB IR - Dec 10_20.pdf (396.94 KB) | ||
GNWT-INF - NWT Hwy 3 Repair Works - Information Request - Nov 26_20.pdf (200.07 KB) | ||
GNWT-INF - NWT Hwy 3 Repair Works - Review Summary and Attachments - Nov 16_20.pdf (608.86 KB) | ||
GNWT-INF - NWT Hwy 3 Repair Works - Draft Water Licence - Type B - Oct 5_20.pdf (311.19 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - NWT Hwy 3 Repair Works - WL Application - Preliminary Screening Determination Notification and RFD - Jan 14_21.pdf (358.27 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - NWT Hwy 3 Repair Works - 2022 Annual Report - Apr 3_23.pdf (602.99 KB) | ||
GNWT-INF - NWT Hwy 3 Repair Works - 2021 Annual Report - Sept 1_22.pdf (292.86 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - NWT Hwy 3 Repair Works - Notification - Project Activities Completed - Aug 30_21.pdf (155.72 KB) | ||
GNWT-INF - NWT Hwy 3 Repair Works - Notification - Notice of Project Activities - Jun 11_21.pdf (91.09 KB) |
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - NWT Hwy 3 Repair Works - Engagement Plan - Version 1.0 - Sep 29_20.pdf (297.63 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - NWT Hwy 3 Repair Works - Erosion and Sediment Control Manual April 2013 - Sep 29_20.pdf (2.99 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - NWT Hwy 3 Repair Works - Spill Contingency Plan - Version 1.0 - Sep 29_20.pdf (338.74 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - NWT Hwy 3 Repair Works - Waste Management Plan - Version 1.0 - Sep 29_20.pdf (313.24 KB) |