Rebecca Aylward - MV2017X0010

The purpose of the work is the remediation of heating oil (petroleum hydrocarbon) impacts in groundwater and the saturated sand and gravel below the water table that could not be conventionally excavated. The proposed

remediation method is by injection of chemical oxidants into the soil below the water table to destroy the contamination. Additional work includes drilling up to 4 off-site boreholes to delineate potential hydrocarbon

contamination, and the installation of up to 6 groundwater wells on-site to monitor remediation progress and confirm success of the remediation program. See attached information.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 8 of 8
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
MV2017X0010 - Rebecca Aylward - Esker - Discontinuance and Final Clearance Letter - Aug30-18.pdf (287.13 KB)
MV2017X0010 - Esker - Discontinuance Letter - Aug30_18.pdf (329.17 KB)
MV2017X0010 - Esker - Final Clearance Letter - Aug30_18.pdf (173.7 KB)
MV2017X0010 - Rebecca Aylward - Issuance - Type B LUP with Conditions and RFD - May4-17.pdf (1.18 MB)
Final Plan and Clearance
Document Received/Sent Uploaded
MV2017X0010 - Rebecca Aylward - Esker - Staff Report - Discontinuance and Final Clearance - Aug30-18.pdf (182.77 KB)
MV2017X0010 - Esker - Staff Report - Discontinuance and Final Clearance - Aug30_18.pdf (209.09 KB)
MV2017X0010 - - Rebecca Aylward - Receipt of final Inspection - Aug16-18.pdf (424.79 KB)
MV2017X0010 - Rebecca Alywayd Esker Consulting - Notice of Receipt of Discontinuance Request - Aug16-18.pdf (256.86 KB)