DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0049 End of Contract for Early Works Paste Backfill - Mar4_25.pdf (136.21 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0049 End of Contract for Early Works Paste Backfill - Mar4_25.pdf (136.21 KB) |
|
|
GNWT-INF |
MV2023X0029 |
GNWT-INF - Transmission Line - Notification - Drill Program Schedule Delay - Feb25_25.pdf (33.61 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0062 Start of Work 20250214 - Inspector approval - Feb24_25.pdf (191.54 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0062 Start of Work 20250214 - Inspector approval - Feb24_25.pdf (191.54 KB) |
|
|
Arctic Canadian Diamond Company Ltd. |
W2022L2-0001 |
Ekati - Spring 2024 Seepage EQC Exceedances Notification - Resubmission - Feb 22_25.pdf (7.99 MB) |
|
|
Arctic Canadian Diamond Company Ltd. |
W2017D0004 |
Misery Underground - Spill Report - Detailed Spill Report - 2025090 - Feb 22_25.pdf (964.68 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0062 - Start of Work and Board Staff Q and Response - Feb18_25.pdf (1.51 MB) |
|
|
Arctic Canadian Diamond Company Ltd. |
W2022L2-0001 |
Ekati - Authorization to Discharge - King Pond to Cujo Lake- Feb 18_25.pdf (171.75 KB) |
|
|
Arctic Canadian Diamond Company Ltd. |
W2022L2-0001 |
Ekati - Request for Authorization - Discharge from KPSF to Cujo Lake - Feb 18_25.pdf (1.27 MB) |
|
|
Arctic Canadian Diamond Company Ltd. |
W2022L2-0001 |
Ekati - Detailed Spill Report -Spill-2025089 - Feb 17_25.pdf (369.98 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0062 Start of Work - Feb 14_25.pdf (332.4 KB) |
|
|
Northwest Territories Power Corporation |
MV2024X0002 |
NTPC - Bluefish - Road and Camp - Notification of Winter Road Opening - Feb5_25.pdf (244.33 KB) |
|
|
Canadian Zinc Corporation |
MV2014F0013 |
CZN - ASR - Phase 1 Winter Road - Drilling Locations - Feb4_25.pdf (833.59 KB) |
|
|
Canadian Zinc Corporation |
PC2014F0013 |
CZN - ASR - Phase 1 Winter Road - Drilling Locations - Feb4_25.pdf (833.59 KB) |
|
|
Northwest Territories Power Corporation |
MV2011L4-0002 |
NTPC - Wet Commissioning Update 2025 - South Valley Spillway Map - Jan31_25.jpg (96.8 KB) |
|
|
Northwest Territories Power Corporation |
W2021Q0011 |
NTPC - Notification - Commencement of the Snare Winter Ice Road - Jan 31_25.pdf (3.71 MB) |
|
|
Northwest Territories Power Corporation |
MV2011L4-0002 |
NTPC - Wet Commissioning Update - Resumption of activities on February 3 2025 - Jan31_25.pdf (297.1 KB) |
|
|
Northwest Territories Power Corporation |
MV2024X0002 |
NTPC - Bluefish - Road and Camp - Notification of Commencement of Construction of Winter Road with Map - Jan29_25.pdf (1.84 MB) |
|
|
Northwest Territories Power Corporation |
MV2024X0002 |
NTPC - Bluefish - Road and Camp - Winter Road Map - Jan29_25.pdf (2.04 MB) |
|
|
Northwest Territories Power Corporation |
MV2024X0002 |
NTPC - Bluefish - Road and Camp - Engagement Plan 2024 - Jan29_25.pdf (469.05 KB) |
|
|
GNWT-INF |
MV2023X0029 |
GNWT-INF - Transmission Line - Notification - Drill Program Schedule and Summary - Jan28_25.pdf (954.56 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0097 Civil Works MSA - Office Trailer Complex Start of Work - Jan28_25.pdf (259.92 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0097 Civil Works MSA - Office Trailer Complex Start of Work - Jan28_25.pdf (259.92 KB) |
|
|
GNWT-INF |
MV2024E0003 |
GNWT-INF - HWY 3 and 4 - Notification - Drilling Locations and Email Chain - Jan 24_25.pdf (120.12 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0057 Investigative Drilling Program End of Project - Jan22_25.pdf (110.83 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0057 Investigative Drilling Program End of Project - Jan22_25.pdf (110.83 KB) |
|
|
City of Yellowknife |
MV2021L3-0003 |
City of YK - EQC Exceedance on January 8 2025 - Jan20_25.pdf (247.11 KB) |
|
|
Diavik Diamond Mines (2012) Inc. |
W2015L2-0001 |
Diavik - DDMI Letter to Inspector - Follow-up to Spill Report 2024-475 - Jan 20_25.pdf (1.29 MB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0058-UBC Bridge Resurfacing- Jan14_25.pdf (501.45 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0058-UBC Bridge Resurfacing- Jan14_25.pdf (501.45 KB) |
|
|
Northwest Territories Power Corporation |
MV2011L4-0002 |
NTPC - Wet Commissioning Activities at Taltson Hydro - Jan13_25.pdf (297.9 KB) |
|
|
Northwest Territories Power Corporation |
MV2011L4-0002 |
NTPC - Wet Commissioning Activities at Taltson Hydro - South Valley Spillway - Jan13_25.jpg (96.8 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0049 -0057 and -0097 Letter of Acceptance - Off-site Registered Waste Receiver - Jan10_25.pdf (262.79 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0049 -0057 and -0097 Letter of Acceptance - Off-site Registered Waste Receiver - Jan10_25.pdf (262.79 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0080 Letter of Acceptance - Off-site Registered Waste Receiver -Dec20_24.pdf (119.38 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0080 Letter of Acceptance - Off-site Registered Waste Receiver -Dec20_24.pdf (119.38 KB) |
|
|
Diavik Diamond Mines (2012) Inc. |
W2015L2-0001 |
Diavik - Notice of Non-Compliance - DDMI Letter to WLWB - Re Unavailable ELS Testing in 2024 - Dec 20_24.pdf (312.76 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0005 Underground Care and Maintenance End of Project - Dec19_24.pdf (109.28 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0005 Underground Care and Maintenance End of Project - Dec19_24.pdf (109.28 KB) |
|
|
Arctic Canadian Diamond Company Ltd. |
W2022L2-0001 |
Ekati - Spring 2024 Seepage EQC Exceedances Notification - Dec 18_24.pdf (8.09 MB) |
|
|
Arctic Canadian Diamond Company Ltd. |
W2023F0004 |
Ekati - Sable Haul Road - Detailed Spill Report - 2024424 - Dec 17_24.pdf (482.83 KB) |
|
|
Diavik Diamond Mines (2012) Inc. |
W2015L2-0001 |
Diavik - DDMI Letter to Inspector - Follow-up to Spill Report 2024-423 - Dec 17_24.pdf (566.62 KB) |
|
|
Canadian Natural Resources Limited |
MV2017X0034 |
CNRL - Response to OROGO Follow Up Letter for P-66 - Dec9_24.pdf (467.56 KB) |
|
|
South Nahanni Outfitters Ltd. |
MV2022J0023 |
SNOL - community outreach letter - Dec2_24.pdf (675.94 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0012 - Request and Approval - Highly Contaminated Waste Storage Area - Nov30_24.pdf (430.75 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0012 - Request and Approval - Highly Contaminated Waste Storage Area - Nov30_24.pdf (430.75 KB) |
|
|
Arctic Kingdom Wilderness Lodge Holdings Inc. |
MV2024L3-0008 |
Arctic Kingdom - Notification and acknowledgement of site activities - Nov28_24.pdf (261.9 KB) |
|
|
Arctic Kingdom Wilderness Lodge Holdings Inc. |
MV2024J0026 |
Arctic Kingdom - Notification and acknowledgement of site activities - Nov28_24.pdf (261.9 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0080 Temporary Storage Area Approval Request - Nov26_24.pdf (533.15 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0080 Temporary Storage Area Approval Request - Nov26_24.pdf (533.15 KB) |
|
|
Diavik Diamond Mines (2012) Inc. |
W2015L2-0001 |
Diavik - Operational Notification - Airport Emergency Vehicle Storage Building - Nov 21_24.pdf (733.01 KB) |
|
|
Sambaa Ke First Nation |
MV2018L3-0001 |
SKFN - Inspector authorization of emergency decant and lagoon analytical results - Nov19_24.pdf (1.01 MB) |
|
|
Canadian Natural Resources Limited |
MV2017X0034 |
CNRL - OROGO Follow Up for P-66 Pipelines and Contamination - Nov15_24.pdf (384.25 KB) |
|
|
Parsons Inc |
MV2024X0019 |
Parsons - Hay River Terminal ESA - Board response to Parsons email of unauthorized work - Nov14_24.pdf (356.28 KB) |
|
|
Diavik Diamond Mines (2012) Inc. |
W2015L2-0001 |
Diavik - DDMI Letter to Inspector - Follow-up to Spill Report 2024-377 - Nov 12_24.pdf (836.48 KB) |
|
|
Arctic Canadian Diamond Company Ltd. |
W2022L2-0001 |
Ekati - 2024 TRSP to Horseshoe Lake Pumping Summary - Data - Nov 9_24.pdf (8.97 MB) |
|
|
Arctic Canadian Diamond Company Ltd. |
W2022L2-0001 |
Ekati - 2024 TRSP to Horseshoe Lake Pumping Summary - Nov 9_24.pdf (133.55 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0012 Additional Chemical for Use Onsite - Nov8_24.pdf (490.43 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0107 Submission of Letter of Acceptance - Off-site Registered Waste Receiver -Nov8_24.pdf (275.73 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0012 Additional Chemical for Use Onsite - Nov8_24.pdf (490.43 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0107 Submission of Letter of Acceptance - Off-site Registered Waste Receiver -Nov8_24.pdf (275.73 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0107 Offsite Waste Disposal Without LOA - Nov7_24.pdf (71.27 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0107 Offsite Waste Disposal Without LOA - Nov7_24.pdf (71.27 KB) |
|
|
Canadian Zinc Corporation |
MV2021L2-0004 |
CZN - Prairie Creek Site Closure Notification 2024 Season - Nov4_24.pdf (109.91 KB) |
|
|
Town of Fort Smith |
MV2011L3-0001 |
Ft Smith - Notification of Licence expiry - Oct30_24.pdf (148.72 KB) |
|
|
Town of Fort Smith |
MV2011L3-0001 |
Ft Smith - Inspector direction re work on Sewage Disposal Facilities - Oct29_24.pdf (98.87 KB) |
|
|
City of Yellowknife |
MV2024X0011 |
City of YK - October 24 2024 drilling notification - Oct24_24.pdf (187.79 KB) |
|
|
De Beers Canada Inc. - Gahcho Kue |
MV2005L2-0015 |
De Beers Gahcho Kue - 2024 Annual Geotech Inspection - Oct23_24.pdf (1.69 MB) |
|
|
De Beers Canada Inc. - Gahcho Kue |
MV2005L2-0015 |
De Beers Gahcho Kue - 2024 Annual Geotech Inspection - Appendix - Oct23_24.pdf (185.11 MB) |
|
|
City of Yellowknife |
MV2024X0011 |
City of YK - Correspondence re drilling notfication - Oct22_24.pdf (162.92 KB) |
|
|
Arctic Canadian Diamond Company Ltd. |
W2024D0006 |
Ekati - Sable UG - Early Works Permit - Letter from the Board - Oct 22_24.pdf (202.18 KB) |
|
|
Arctic Canadian Diamond Company Ltd. |
W2022L2-0001 |
Ekati - Water Quality Exceedence - KPSF to Cujo Lake July 2024 - Follow up Report - Oct 19_24.pdf (4.14 MB) |
|
|
City of Yellowknife |
MV2021L3-0003 |
City of YK - Sampling update from City staff - Oct18_24.pdf (127.77 KB) |
|
|
CIRNAC-CARD |
W2020X0005 |
Rayrock - Notification - Seasonal Site Demobilization - Oct 18_24.pdf (232.08 KB) |
|
|
CIRNAC-CARD |
W2020L8-0003 |
Rayrock - Notification - Seasonal Site Demobilization - Oct 18_24.pdf (232.08 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0012 Temporary Storage of Aggregate Material in South Pond -Rev1 - Oct16_24.pdf (500.75 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0012 Temporary Storage of Aggregate Material in South Pond -Rev1 - Oct16_24.pdf (500.75 KB) |
|
|
Canadian Natural Resources Limited |
MV2017X0034 |
CNRL - Status Update - Oct15_24.pdf (17.11 MB) |
|
|
City of Yellowknife |
MV2024X0011 |
City of YK - Update to drilling notification - Oct15_24.pdf (189.64 KB) |
|
|
Hamlet of Fort Resolution |
MV2014L3-0008 |
Ft Resolution - Hamlet responses to Post-Inspection Summary - Oct11_24.pdf (146.65 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0012 Additional Near Water Work for WTP Construction - Oct11_24.pdf (302.93 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0012 Additional Non-hazardous Temporary Storage Area near Biomass Building - Oct11_24.pdf (260.92 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0012 Additional Near Water Work for WTP Construction - Oct11_24.pdf (302.93 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0012 Additional Non-hazardous Temporary Storage Area near Biomass Building - Oct11_24.pdf (260.92 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - Notification of SNP deviation week of Sept 22-28 2024 - Oct11_24.pdf (89.57 KB) |
|
|
Teck Metals Ltd. |
MV2019X0006 |
Teck Metals - Notification of Upcoming Work - Oct10_24.pdf (76.31 KB) |
|
|
City of Yellowknife |
MV2024X0011 |
City of YK - Notification of Drilling - Map of proposed boreholes - Oct10_24.pdf (490.35 KB) |
|
|
Parsons Inc |
MV2024X0019 |
Parsons - Hay River Terminal ESA - Notification - Completion of Seasonal Activities - Oct9_24.pdf (66.9 KB) |
|
|
Diavik Diamond Mines (2012) Inc. |
W2015L2-0001 |
Diavik - DDMI Letter to Inspector - Follow-up to Spill Report 2024-335 - Oct 9_24.pdf (1.61 MB) |
|
|
Parsons Inc |
MV2024X0019 |
Parsons - Hay River Terminal ESA - Parsons email re completion of work - Oct9_24.pdf (260.79 KB) |
|
|
WestCoast Energy Inc. |
MV2023P0036 |
Westcoast - October 2024 Project Update - Oct8_24.pdf (116.86 KB) |
|
|
WestCoast Energy Inc. |
MV2023L1-0013 |
Westcoast - October 2024 Project Update - Oct8_24.pdf (116.86 KB) |
|
|
GNWT-ECC |
MV2024L8-0007 |
GNWT-ECC - Checkpoint - Discharge - Inspector Approval - Oct7_24.pdf (1.75 MB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0058 30 Day Spill Report for NW Pumphouse Mine Water Release - Oct1_24.pdf (269.25 KB) |
|
|
Hamlet of Fort Providence |
MV2016L3-0001 |
Ft Providence - Correspondence from Inspector re fall lagoon decant - Oct1_24.pdf (574.55 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification 476721-0080 Update to Start of Work and Laydown Area -Sep27_24.pdf (535.95 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification 476721-0080 Update to Start of Work and Laydown Area -Sep27_24.pdf (535.95 KB) |
|
|
GNWT-ECC |
MV2024L8-0007 |
GNWT-ECC - Checkpoint - Discharge Request - Sep27_24.pdf (1.91 MB) |
|
|
Arctic Canadian Diamond Company Ltd. |
W2017D0004 |
Misery Underground - Spill Report - Detailed Spill Report - 2024360 - Sep 25_24.pdf (586.6 KB) |
|
|