Fortune Minerals Limited - W2008L2-0004
Status:
Issued
Authorization:
Licence
Activity:
Mining and Milling
Start:
July 21, 2014
Expiry:
July 21, 2026
Staff:
Brenda Van Hauvart
This Licence entitles the Licensee to use water from Lou Lake and dispose of Waste for the purpose of constructing, operating, closing, and reclaiming the NICO Project, a Gold‐Cobalt‐Bismuth‐Copper mine located approximately 160 kilometres (km) northwest of Yellowknife, 50 km northeast of Whatì, and 10 km east of Hislop Lake in the Northwest Territories (NWT) on Mineral Leases NT-4681, 4682, 4678, 4679, 4237, 4677, 4684, 4683, 4238, 4680.The scope of this Licence includes the following:• an open pit and underground mine;• a mineral processing plant, which includes crushing, grinding, flotation, and service components;• a Co-Disposal Facility (CDF);• an effluent treatment facility;• the Constructed Wetland Treatment Systems (CWTS);• explosives storage facility;• borrow sources within the aforementioned Mineral Leases;• a camp and truck shop; and• site services infrastructure such as petroleum storage facilities, water lines, electrical distribution, site roads, a power plant, a Sewage treatment plant, an incinerator, and material sorting facilities.The scope of this Licence is as described in “Table 3: Final Scope of Development” in the Report of Environmental Assessment, and does not include the following:• the Construction, use, and Reclamation of the NICO Project Access Road outside of the aforementioned Mineral Leases;• the bridge over the Marian River;• the use of the Tłı̨chǫ road; and• the development of borrow sources for aggregate production along the NICO Project Access Road outside of the aforementioned Mineral Leases.
Documents
- AEMP - Program (3)
- All Issuances (18)
- Annual Reports (14)
- Application and Related Docs (41)
- Assorted Management Plans (15)
- Conceptual Closure and Reclamation Plan (2)
- Consultations - Reviews - Work Plans (26)
- Engagement Plan (4)
- Environmental Assessment (1)
- Inspection Reports (1)
- Interim Closure and Reclamation Plan (16)
- Operations and Notifications (5)
- Other (6)
- Other Monitoring Program (18)
- Public Hearing (30)
- Security and Water Use Fees (19)
- Sediment and Erosion Control (1)
- SNP Program (4)
- SNP Reports (28)
- Spill - Contingency - Emergency Response (2)
- Technical Session (27)
- Waste Management Plan (1)
- Water Management (2)
- WEMP - Wildlife Effects Monitoring Program (2)
Displaying 201 - 290 of 290
5. Reports and Studies
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
NICO Mine - CDF Presentation_final 08 December 2013 Rev 4 - Dec 9_13.pdf (1.75 MB) | ||
NICO Mine - CoDisposal Facility (CDF) Management Plan - Oct 11_13.pdf (18.14 MB) | ||
NICO Mine - Mine Rock Management Plan - Oct 11_13.pdf (5.14 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
NICO Mine - Engagement Plan - Version 2.0 - Board Directive and Reasons for Decision - Dec 15_14.pdf (744.66 KB) | ||
NICO Mine - Engagement Plan - Version 2.0 - Review summary and attachments - Dec 15_14.pdf (453.38 KB) | ||
NICO Mine - Engagement Plan - Version 2.0 - Sep 22_14.pdf (452.71 KB) | ||
NICO Mine - Engagement Plan - Version 1.0 - Oct 11_13.pdf (615.62 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
NICO Mine - Erosion and Sediment Control Plan - Oct 11_13.pdf (11.92 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
NICO Mine - Emergency Response Plan - Oct 11_13.pdf (1.59 MB) | ||
NICO Mine - Spill Contingency Plan - Oct 11_13.pdf (1.8 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
NICO Mine - Waste Management Plan - Oct 11_13.pdf (1.7 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
NICO Mine - WUL Presentation Dec 2013 v3 - Dec 9_13.pdf (3.45 MB) | ||
NICO Mine - Water Management Plan - Oct 11_13.pdf (16.85 MB) |
7. Monitoring Programs
Document | Received/Sent | Uploaded |
---|---|---|
NICO Mine - AEMP Design Plan - Deadline Extension - Board Directive - Sep 9_15.pdf (467.22 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
NICO Mine - WLWB Deadline Extensions - Dec 18_14.pdf (120.73 KB) | ||
NICO Mine - AEMP Presentation - Dec 9_13.pdf (1.83 MB) | ||
NICO Mine - Aquatic Effects Monitoring Program - Oct 21_13.pdf (3.45 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
NICO Mine - Wildlife Effects Monitoring Program - Oct 21_13.pdf (6.08 MB) | ||
NICO Mine - Wildlife and Wildlife Habitat Protection Plan - Oct 21_13.pdf (493.91 KB) |
8. Closure and Reclamation
Document | Received/Sent | Uploaded |
---|---|---|
NICO Mine - CCRP Presentation - Dec 8 2013 Revised Version - Dec 9_13.pdf (6.55 MB) | ||
NICO Mine - Conceptual Closure and Reclamation Plan - Oct 11_13.pdf (31.08 MB) |