CIRNAC-CARD - W2020L8-0003

This Licence entitles the Licensee to use Water and deposit Waste for remediation activities at the Rayrock Remediation Project in the area as described in the Type A Water Licence Application submitted September 21, 2020. The scope of this Licence includes the following:

a) Blasting, quarrying, and drilling activities for remediation activities; removal andshipping or burial of hazardous and non-hazardous waste in the ConfinedDisposal Facility; maintenance of Tailings Containment Areas andDecommissioned Waste Dump; Sherman Lake dock expansion; repairs to capsfor Tailings Containment Areas and decommissioned Waste Dump, incinerationor stockpiling for off-site disposal of waste from Camp operations; closure ofRayrock vent raises and Sun Rose mine shaft; capping waste rock andexploration workings at Sun Rose site; backfilling of trenches and blasted areasat Horn Plateau – REX Showing site; capping exploration workings at HornPlateau – REX Showing site; burial or trucking out of soil with hazardouschemicals from exploration sites; removal of hazardous waste at barge landingand power line sites; removal of non-hazardous waste from exploration sites;storage and use of explosives; excavation and on-site disposal of spilled tailings;brush and vegetation clearing for access roads; access road development andmaintenance; camp establishment at Rayrock and Sun Rose sites; use andregrading of quarry areas; fuel storage for operations; use of light and heavyequipment on site; treatment and encapsulation of Mill Lake sediments;encapsulation of soil, tailings, and waste rock in Confined Disposal Facility;burial of radiological-impacted debris in Confined Disposal Facility; off-sitedisposal of debris and materials within safe shipping limits for Uranium;removal and disposal of concrete foundations; sewage disposal; andremediation activities as approved in the Remedial Action Plan;b) Withdrawal of Water for use in camp operations, dust control, washing, winterroad construction, and remediation activities as approved in the RemedialAction Plan;c) Dewatering of Mill Lake to Waste Water Treatment Facility before deposit inSherman Lake,d) Depositing of Waste to Confined Disposal Facility and the Camp sump;e) Construction, operation, and maintenance of ice bridges to cross the EmileRiver or the Marian River;f) Construction, operation and maintenance of culverts to allow winter roadpassage;g) Construction, operation and maintenance of the Confined Disposal Facility andSun Main Waste Rock Cover; and
h) Closure and Reclamation activities for the remediation and monitoring of theRayrock project sites.

Rayrock Mine Remedial Action Plan (Rayrock Remediation Project).


Uploaded On or After
Uploaded On or Before
Displaying 201 - 300 of 383
5. Reports and Studies
Designs and As-Builts
Document Received/Sent Uploaded
Rayrock - Mill Lake Water Treatment Facility Design and Construction Plan - Version 1.1 - Appendices A-G - May 31_23.pdf (17.88 MB)
Rayrock - Mill Lake Water Treatment Facility Design and Construction Plan - Version 1.1 - May 31_23.pdf (8.96 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Reasons for Decision - May 01_23.pdf (418.81 KB)
Rayrock - Mill Lake Water Treatment Facility Design and Construction Plan - V 1.0 - Reasons for Decision - May 01_23.pdf (447.02 KB)
Rayrock - Mill Lake Water Treatment Facility Design and Construction Plan - Version 1.0 - Jan 6_23.pdf (17.37 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Dec 22_22.pdf (3.85 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix A - Drawings and Specifications II - Dec 22_22.pdf (27.43 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix A - Drawings and Specifications IV - Dec 22_22.pdf (25.61 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report I - Dec 22_22.pdf (14.74 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report V - Dec 22_22.pdf (814.6 KB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report VIII - Dec 22_22.pdf (3.97 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part II - Dec 22_22.pdf (25.62 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix A - Drawings and Specifications I - Dec 22_22.pdf (24.19 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix A - Drawings and Specifications III - Dec 22_22.pdf (22.82 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report II - Dec 22_22.pdf (28.5 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report III - Dec 22_22.pdf (25.3 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report IV - Dec 22_22.pdf (23.32 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report VI - Dec 22_22.pdf (21.32 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report VII - Dec 22_22.pdf (21.32 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix C - Basis of Payment - Dec 22_22.pdf (264.1 KB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix D - Membrane Life Assessment - Dec 22_22.pdf (28.91 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix E - Forms - Dec 22_22.pdf (368.4 KB)
Rayrock - Confined Disposal Facility and Sun Main Waste Rock Cover Design Plans - Conformity Correspondence - Dec 22_22.pdf (318.32 KB)
Inspection Reports
Document Received/Sent Uploaded
Rayrock - Inspection Report - Aug 31_24.pdf (2.04 MB)
Rayrock - Inspection Report Lab Results - Aug 31_24.pdf (480.5 KB)
Rayrock - Inspection Report - Jul 30_24.pdf (1.3 MB)
Rayrock - Inspection Report - May 30_24.pdf (5.22 MB)
Operations and Notifications
Document Received/Sent Uploaded
Rayrock - Notification - Seasonal Site Demobilization - Oct 18_24.pdf (232.08 KB)
Rayrock - Notification - CWWTP EQC Exceedance - Sep 11_24.pdf (263.67 KB)
Rayrock - Email String - Update on Camp Wastewater Containment Structure - Sep 6_24.pdf (10.07 MB)
Rayrock - Email String - Update on Camp Wastewater Containment Structure - Aug 23_24.pdf (866.16 KB)
Rayrock - Notification - Authorization to Discharge Compliant Water to Sherman Lake - Aug 9_24.pdf (259.48 KB)
Rayrock - Notification - Water Samples Analysis Results - Jul 30_24.pdf (487.41 KB)
Rayrock - Notification - Advanced Notice PWTP Discharge to Mill Lake - Jul 29_24.pdf (265.29 KB)
Rayrock - Notification - Update on Concentrations Exceeding AEMP High Action Levels - Jul 17_24.pdf (200.34 KB)
Rayrock - Email String - Treated Wastewater Exceeding EQC - Jul 9_24.pdf (375.74 KB)
Rayrock - Notification - Concentrations Exceeding AEMP High Action Levels - June 28_24.pdf (153.34 KB)
Rayrock - Notification - Commencement of Construction of Confined Disposal Facility - Jun 28_24.pdf (318.91 KB)
Rayrock - Update on Unauthorized Construction of Wastewater Containment Structure - Jul 2_24.pdf (672.85 KB)
Rayrock - Email String - Update on Unauthorized Construction of Wastewater Containment Structure -Jul 2_24.pdf (155.76 KB)
Rayrock - Email String - Unauthorized Construction and Use of Wastewater Containment Structure - June 14_24.pdf (6.88 MB)
Rayrock - Notification - Unauthorized Construction and Use of Wastewater Containment Structure - Jun 10_24.pdf (6.86 MB)
Rayrock - Notification - Update on Sewage Disposal - May 29_24.pdf (155.42 KB)
Rayrock - Certificate of Analysis - Guideline Evaluation - Nov 17_23.pdf (489.1 KB)
Rayrock - Email String - Certificate of Analysis - Guideline Evaluation - Nov 17_23.pdf (211.5 KB)
Rayrock - CWWTP Results Analysis and Request for Discharge From SNP 1663-11 - Nov 06_23.pdf (114.99 KB)
Rayrock - Notification - Intention to Commence Winter Road Construction - Feb 1_23.pdf (96.16 KB)
Other
Document Received/Sent Uploaded
Rayrock - Confined Disposal Facility - Thermal Modelling - Jul 5_21.pdf (4.59 MB)
Rayrock - Confined Disposal Facility - Hydrological Modelling - Sept 9_21.pdf (3.5 MB)
SNP Reports
Document Received/Sent Uploaded
Rayrock -September 2024 - Surveillance Network Program Report - Dec 6_24.pdf (9.35 MB)
Rayrock - August 2024 - Surveillance Network Program Report - Oct 31_24.pdf (7.48 MB)
Rayrock - August 2024 - SNP Report Electronic Data File - Oct 31_24.zip (6.55 MB)
Rayrock - July 2024 - Surveillance Network Program Report - Oct 1_24.pdf (5.59 MB)
Rayrock - July 2024 - SNP Electronic Data File - Oct 1_24.zip (106.44 KB)
Rayrock - June 2024 - Surveillance Network Program Report - Sep 3_24.pdf (4.71 MB)
Rayrock - June 2024 - SNP Report Electronic Data File - Sep 3_24.zip (108.24 KB)
Rayrock - (July-Sept) 2023 - SNP Report Electronic Data File - May 31_24.zip (77.38 KB)
Rayrock - June 2023 - Updated Surveillance Network Program Report - March 25_24.pdf (3.32 MB)
Rayrock - September 2023 - Updated Surveillance Network Program Report - March 25_24.pdf (2.73 MB)
Rayrock - July 2023 - Updated Surveillance Network Program Report - March 25_24.pdf (3.56 MB)
Rayrock - (July-Sept) 2023 - Updated SNP Report Electronic Data - March 25_24.zip (78.18 KB)
Rayrock - Niovember 2023 - Surveillance Network Program Report - Jan 26_24.pdf (2.06 MB)
Rayrock - Water Quality Data Tables (Oct - Nov 2023) - Sanexen Camp Wash and Wastewater - Jan 26_24.zip (15.05 KB)
Rayrock -October 2023 - Surveillance Network Program Report - Jan 26_24.pdf (1.61 MB)
Rayrock - (July-Sept) 2023 - SNP Report Electronic Data File - Jan 26_24.zip (68.15 KB)
Rayrock - September 2023 - Surveillance Network Program Report - Dec 21_23.pdf (2.83 MB)
Rayrock - June 2023 - Surveillance Network Program Report - Sep 14_23.pdf (3.42 MB)
Rayrock - July 2023 - Surveillance Network Program Report - Sept 25_23.pdf (3.66 MB)
Rayrock - August 2023 - Surveillance Network Program Report - Sept 25_23.pdf (125.1 KB)
Rayrock - September 2022 - Surveillance Network Program Report - Dec 6_22.pdf (4.66 MB)
Rayrock - August 2022 - Surveillance Network Program Report - Nov 3_22.pdf (2.95 MB)
Rayrock - July 2022 - Surveillance Network Program Report - Sept 27_22.pdf (3.13 MB)
Rayrock - June 2022 - Surveillance Network Program Report - Aug 31_22.pdf (2.89 MB)
Rayrock - May 2022 - Surveillance Network Program Report - Aug 8_22.pdf (114.27 KB)
Spill Reports
Document Received/Sent Uploaded
Rayrock - GT21-604 - Spill Follow up Report for NTNU 2023-500 - Dec 12_23.pdf (4.18 MB)
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
Rayrock - Quarry Management Plan - Version 1.2 – Conformity Confirmation – Feb 8_24.pdf (218.09 KB)
Rayrock - Quarry Management Plan - Version 1.2 - Part 1 - Jan 30_24.pdf (13.05 MB)
Rayrock - Quarry Management Plan - Version 1.2 - Part 4 - Jan 30_24.pdf (16.16 MB)
Rayrock - Quarry Management Plan - Version 1.2 - Part 2 - Jan 30_24.pdf (12.71 MB)
Rayrock - Quarry Management Plan - Version 1.2 - Part 3 - Jan 30_24.pdf (15.55 MB)
Rayrock - Quarry Management Plan - Version 1.1 - Reasons for Decision - Nov 1_23.pdf (378.16 KB)
Rayrock - Quarry Management Plan - Version 1.1 - Part 1 - Attachment A - Jul 19_23.pdf (1.75 MB)
Rayrock - Quarry Management Plan - Version 1.1 - Part 3 - Appendices C-E - Jul 19_23.pdf (9.4 MB)
Rayrock - Quarry Management Plan - Version 1.1 - Part 4 - Attachment B - Jul 19_23.pdf (1.18 MB)
Rayrock - Quarry Management Plan - Version 1.1 - Part 2 - Appendices A-B - Jul 19_23.pdf (30.02 MB)
Rayrock - Quarry Management Plan - Version 1.0 - Reasons for Decision - May 23_23.pdf (394.46 KB)
Rayrock - Quarry Management Plan - Version 1 - Part 2 - Apr 5_23.pdf (6.49 MB)
Rayrock - Quarry Management Plan - Version 1 - Part 1 - Apr 5_23.pdf (16.68 MB)
Engagement Plan
Document Received/Sent Uploaded
Rayrock - Engagement Plan - Version 4.0 - Decision Letter - Sept 29_22.pdf (187.92 KB)
Rayrock - Engagement Plan - Version 4.0 - Sept 19_22.pdf (1.62 MB)
Sediment and Erosion Control
Document Received/Sent Uploaded
Rayrock - Sediment and Erosion Control Plan - Version 2.1 - Reasons for Decision - Dec 14_23.pdf (322.24 KB)
Rayrock - Sediment and Erosion Control Plan - Version 2.1 - Part 1 of 2 - Oct 18_23.pdf (18.29 MB)
Rayrock - Sediment and Erosion Control Plan - Version 2.1 - Part 2 of 2 - Oct 18_23.pdf (5.66 MB)
Rayrock - Sediment and Erosion Control Plan - Version 2.0 - Reasons for Decision - May 23_23.pdf (477.94 KB)
Rayrock - Sediment and Erosion Control Plan - Version 2.0 - Mar 30_23.pdf (12.77 MB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
Rayrock - Spill Contingency Plan - Version 4.2 - Part 1 - March 26_24.pdf (15.7 MB)
Rayrock - Spill Contingency Plan - Version 4.2 – Conformity Confirmation – April 9_24.pdf (146.24 KB)
Rayrock - Spill Contingency Plan - Version 4.2 - Part 2 - March 26_24.pdf (13.82 MB)
Rayrock - Spill Contingency Plan - Version 4.1 - Decision Letter - Jul 6_23.pdf (210.31 KB)
Rayrock - Spill Contingency Plan - Version 4.1 - Jun 7_23.pdf (21.4 MB)