CIRNAC-CARD - W2020L8-0003
Status:
Issued
Authorization:
Licence
Activity:
Miscellaneous
Start:
November 18, 2021
Expiry:
November 17, 2031
Staff:
Anneli Jokela
This Licence entitles the Licensee to use Water and deposit Waste for remediation activities at the Rayrock Remediation Project in the area as described in the Type A Water Licence Application submitted September 21, 2020. The scope of this Licence includes the following:
a) Blasting, quarrying, and drilling activities for remediation activities; removal andshipping or burial of hazardous and non-hazardous waste in the ConfinedDisposal Facility; maintenance of Tailings Containment Areas andDecommissioned Waste Dump; Sherman Lake dock expansion; repairs to capsfor Tailings Containment Areas and decommissioned Waste Dump, incinerationor stockpiling for off-site disposal of waste from Camp operations; closure ofRayrock vent raises and Sun Rose mine shaft; capping waste rock andexploration workings at Sun Rose site; backfilling of trenches and blasted areasat Horn Plateau – REX Showing site; capping exploration workings at HornPlateau – REX Showing site; burial or trucking out of soil with hazardouschemicals from exploration sites; removal of hazardous waste at barge landingand power line sites; removal of non-hazardous waste from exploration sites;storage and use of explosives; excavation and on-site disposal of spilled tailings;brush and vegetation clearing for access roads; access road development andmaintenance; camp establishment at Rayrock and Sun Rose sites; use andregrading of quarry areas; fuel storage for operations; use of light and heavyequipment on site; treatment and encapsulation of Mill Lake sediments;encapsulation of soil, tailings, and waste rock in Confined Disposal Facility;burial of radiological-impacted debris in Confined Disposal Facility; off-sitedisposal of debris and materials within safe shipping limits for Uranium;removal and disposal of concrete foundations; sewage disposal; andremediation activities as approved in the Remedial Action Plan;b) Withdrawal of Water for use in camp operations, dust control, washing, winterroad construction, and remediation activities as approved in the RemedialAction Plan;c) Dewatering of Mill Lake to Waste Water Treatment Facility before deposit inSherman Lake,d) Depositing of Waste to Confined Disposal Facility and the Camp sump;e) Construction, operation, and maintenance of ice bridges to cross the EmileRiver or the Marian River;f) Construction, operation and maintenance of culverts to allow winter roadpassage;g) Construction, operation and maintenance of the Confined Disposal Facility andSun Main Waste Rock Cover; andh) Closure and Reclamation activities for the remediation and monitoring of theRayrock project sites.
Rayrock Mine Remedial Action Plan (Rayrock Remediation Project).
Documents
- AEMP - Annual Report (12)
- AEMP - Program (12)
- All Issuances (8)
- Annual Reports (3)
- Application and Related Docs (21)
- Assorted Management Plans (13)
- Consultations - Reviews - Work Plans (22)
- Designs and As-Builts (102)
- Engagement Plan (2)
- GIS Data (1)
- Inspection Reports (4)
- Interim Closure and Reclamation Plan (18)
- Operations and Notifications (20)
- Other (2)
- Preliminary Screening (5)
- Public Hearing (35)
- Sediment and Erosion Control (5)
- SNP Program (5)
- SNP Reports (25)
- Spill - Contingency - Emergency Response (8)
- Spill Reports (1)
- Technical Session (22)
- Waste Management Plan (13)
- Water Management (24)
Displaying 301 - 383 of 383
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Spill Contingency Plan - Version 4.1 - Letter from Tlicho Government - Jun 2_23.pdf (751.73 KB) | ||
Rayrock - Spill Contingency Plan - Version 4.0 - Reasons for Decision - May 1_23.pdf (455.14 KB) | ||
Rayrock - Spill Contingency Plan - Version 4.0 - Mar 17_23.pdf (18.15 MB) |
7. Monitoring Programs
8. Closure and Reclamation
9. GIS Data
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - GIS Data - Oct 5_21.zip (13.95 KB) |