Imperial Oil Resources Ltd. |
S13L1-007 |
S13L1-007 - Notification - River Water Intake - Rerouting and Repair - Jul 16_21.pdf (638.65 KB) |
|
|
Imperial Oil Resources Ltd. |
S13L1-007 |
S13L1-007 - Notification of postpone Artificial Island Repair Work - Feb 8_21.pdf (547.17 KB) |
|
|
Enbridge Pipelines (NW) Inc. |
S20L1-001 |
S20L1-001 - S20P-003 - YK STF Acceptance Letter - KBL Waste Facility - Jan 22_21.pdf (307.63 KB) |
|
|
Enbridge Pipelines (NW) Inc. |
S20L1-001 |
S20L1-001 - S20P-003 - KP158 - Project Contact List - Jan 11_21.pdf (90.43 KB) |
|
|
Imperial Oil Resources Ltd. |
S13L1-007 |
S13L1-007 - Notification of Goose Island Flowlines Remediation Scope - Jun 9_20.pdf (169.22 KB) |
|
|
Imperial Oil Resources Ltd. |
S13L1-007 |
S13L1-007 - Notification of Settling Pond Sample - May 25_20.pdf (198.01 KB) |
|
|
Imperial Oil Resources Ltd. |
S13L1-007 |
S13L1-007 - Notification of relaese of settling pond water - May 20_20.pdf (126.13 KB) |
|
|
Imperial Oil Resources Ltd. |
S13L1-007 |
S13L1-007 - Notification of release of settling pond water - May 20_20.pdf (126.13 KB) |
|
|
Imperial Oil Resources Ltd. |
S13L1-007 |
S13L1-007 - Release of Category B surface water - May 13_20.pdf (284.29 KB) |
|
|
Imperial Oil Resources Ltd. |
S13L1-007 |
S13L1-007 - Settling Pond Cleaning notification - Sep 3_19.pdf (69.74 KB) |
|
|
Imperial Oil Resources Ltd. |
S13L1-007 |
S13L1-007 - CPF Impound Basin Start - Aug 20_19.pdf (546.63 KB) |
|
|
Imperial Oil Resources Ltd. |
S13L1-007 |
S13L1-007 - CPF In CPF Out CPF Grab - Aug 26_19.pdf (832.59 KB) |
|
|
Enbridge Pipelines (NW) Inc. |
S17L1-004 |
S17L1-004 - Enbridge - Notification of Diversion - Feb 16_18.pdf (62.32 KB) |
|
|
Imperial Oil Resources Ltd. |
S13L1-007 |
S13L1-007 - Norman Wells shutdown notification - Mar 8_17.pdf (209.98 KB) |
|
|
Imperial Oil Resources Ltd. |
S03L1-001 |
S03L1-001 - Goose Island to Island 3 in-river work SLWB approval - Jan 9_14.pdf (355.09 KB) |
|
|
Imperial Oil Resources Ltd. |
S03L1-001 |
S03L1-001-Letter - Imperial Oil - Goose Island to Island 3 Cover Work - Nov 24_14.pdf (307.82 KB) |
|
|
Imperial Oil Resources Ltd. |
S03L1-001 |
S03L1-001- Report - Imperial Oil - Goose Island to Island 3 Cover Work - Nov 24_14.pdf (2.36 MB) |
|
|
Imperial Oil Resources Ltd. |
S03L1-001 |
S03L1-001 - Lateral 1 and 3 Replacement Final As-built Drawings - July 31_14.pdf (429.1 KB) |
|
|
ConocoPhillips Canada |
S13L1-004 |
S13L1-004 - Fracturing Fluid Disclosure - Well P-20 - Apr 07_14.pdf (405.53 KB) |
|
|
ConocoPhillips Canada |
S13L1-004 |
S13L1-004 - Fracturing Fluid Disclosure - Well E-76 - Mar 13_14.pdf (389.75 KB) |
|
|
ConocoPhillips Canada |
S12L1-005 |
S12L1-005 - Disposal of Sewage Wastewater in Norman Wells - Notification - Feb 24_14.pdf (86.93 KB) |
|
|
Imperial Oil Resources Ltd. |
S03L1-001 |
S03L1-001 - Updated Upper Bosworth Creek Bridge Restoration - Jan 23_14.pdf (1.55 MB) |
|
|
ConocoPhillips Canada |
S12L1-005 |
S12L1-005 - Water Truck Recovery and Weekly Update - Jan 6 - 12 - Jan _23_14.pdf (4.16 MB) |
|
|
ConocoPhillips Canada |
S13L1-004 |
S13L1-004 - Passive Seismic Monitors Installation - Jan 19_14.pdf (15.5 KB) |
|
|
ConocoPhillips Canada |
S13L1-004 |
S13L1-004 - Risk Assessment of Hydraulic Fracturing Additives - Revised Pre-Job Disclosure - Jan 10_14.pdf (5.81 MB) |
|
|
Imperial Oil Resources Ltd. |
S03L1-001 |
S03L1-001 - Lateral 1 and 3 Injection Supply Line Replacement Project - Nov 15_13.pdf (457.43 KB) |
|
|
ConocoPhillips Canada |
S12L1-005 |
S12L1-005 - Canol Shale Potential Future Development and Effects Considerations - Discussion Paper - May 31_13.pdf (21.62 MB) |
|
|
ConocoPhillips Canada |
S13L1-004 |
S13L1-004 - Canol Shale Potential Future Development and Effects Considerations - Discussion Paper - May 31_13.pdf (21.62 MB) |
|
|
MGM Energy |
S12L1-001 |
S12L1-001 - Wildlife Mapping 2012-2013 - May 07_13.pdf (2.02 MB) |
|
|
MGM Energy |
S12L1-001 |
S12L1-001 - Final Drilling Mud Chemical List - Apr 25_13.pdf (96 KB) |
|
|
MGM Energy |
S12L1-001 |
S12L1-001 - MGM-Shell East Mackay I-78 - Frac Fluid Chemical Disclosure - Apr 04_13.pdf (70.27 KB) |
|
|
Imperial Oil Resources Ltd. |
S03L1-001 |
S03L1-001 - Upper Bosworth Creek Bridge Restoration - Mar 25_13.pdf (4.17 MB) |
|
|
Imperial Oil Resources Ltd. |
S03L1-001 |
S03L1-001 - Exposed Electrical Cable - Bear Island to Island 6 - Mar 21_13.pdf (2.32 MB) |
|
|
Husky Oil Operations Ltd. |
S11L1-003 |
S11L1-003 - Husky Little Bear N-09 - Frac Chemical Disclosure - Mar 21_13.pdf (92.59 KB) |
|
|
MGM Energy |
S12L1-001 |
S12L1-001 - Drilling Waste Analysis Submission - Feb 22_13.pdf (981.47 KB) |
|
|
MGM Energy |
S12L1-001 |
S12L1-001 - Ash Analysis Submission - Feb 22_13.pdf (490.17 KB) |
|
|
MGM Energy |
S12L1-001 |
S12L1-001 - Groundwater Well Soil Sampling Submission - Feb 13_13.pdf (1.46 MB) |
|
|
MGM Energy |
S12L1-001 |
S12L1-001 - Hydraulic Fracturing Chemical Risk Assessment - Jan 25_13.pdf (7.64 MB) |
|
|
Iteration Energy Ltd. |
S04L1-005 |
S04L1-005 - Soil Baseline Testing - Moose Lake D-07 - Oct 18_04.pdf (200.51 KB) |
|
|
Iteration Energy Ltd. |
S04L1-005 |
S04L1-005 - Sump Testing Results - Devlan Moose Lake D-07 - Sept 14_04.pdf (560.07 KB) |
|
|